Billet/Round F-EMS

It is generally installed in the final stage where the molten core is 25%-35% of the width of the billet. The main function is to improve the equiaxed crystal rate of the billet, improve the center porosity and shrinkage , and improve the center segregation and v-shape segregation.

 

It is generally installed in the final stage where the molten core is 25%-35% of the width of the billet. The main function is to improve the equiaxed crystal rate of the billet, improve the center porosity and shrinkage , and improve the center segregation and v-shape segregation.

HUNAN KEMEIDA ELECTRIC CO., LTD. All Rights Reserved           湘公網安備43060402000026號        湘ICP備16013601號-1   
在线精品自偷自拍无|正在播放国产强行反抗|99热门精品一区二区|亚洲速播18禁 久久久久久|中美日韩亚洲中文专区小说